Obahn Busway Adelaide Tunnel Entrances Saturday 27 January 2018

A warm 36C in Adelaide today.
My knees were aching for a bike ride.
I cycled in to take some photographs of the new
$160M  Obahn Busway Tunnel opened on
Monday 11 December 2017.
©billpurvis

Buses entering and exiting the Tunnel at the Grenfell Street/East Tce feeder intersection.

The exit from the city along Hackney Road opposite the National Wine Centre and Botanical Gardens.
Goodman Administration Building adjacent to the Old Tram Barn
Goodman Administration Building - Old Tram Barn located Hackney Road

Hackney Road Tunnel Exit/Entrance opposite Goodman Administration Building and the National Wine Centre

Tunnel Entrance/Exit towards Grenfell Street feeder lanes.


from Grenfell Street towards Tunnel Entrance/Exit

Feeding into Grenfell Street after exiting the Tunnel.

The Tunnel Project


Entering the Tunnel after exiting Grenfell Street. The Obahn is a guided busway. The rails are shown in the foreground on either side of each lane.

Friday, March 31, 2017

Obahn Busway Underpass Construction Hackney Road - Grenfell Street, Adelaide Update 3 - 1 April 2017

Below is the link to my previous blog entries:
Previous Blog entries:

An engineer I stopped to talk to on my previous expedition
advised me the tunnel roof would be laid the weekend of
1st/2nd April from 7am.
I arrived about 8am to find the crane preparing for the
first delivery of a concrete slab.
This is a series of images of the laying of the first and second slabs covering
the tunnel adjacent to the National Wine Centre at the intersection
of North Terrace and Hackney Road.
Apparently warnings of traffic delays were broadcast widely.
Traffic flows on both roads were constricted.

The Gif was constructed of passing cyclists as the first slab was
being lifted off to place over the tunnel.
































Updated photos taken 6 April 2017

Looking north down Hackney Road.

Doesn't look like too much to show for the laying of the slabs but others are placed ready to position.
 
Looking south down Dequetteville Terrace. The continuation of Hackney Road.



Monday, March 27, 2017

Obahn Busway Underpass Construction Hackney Road - Grenfell Street, Adelaide

The Adelaide Obahn Busway is one of only a few in the world, and
the longest.
An underpass is under construction and due to be commissioned
later this year.
It will reduce traffic volume and delays by diverting the
Obahn Bus System off of Hackney Road and North Terrace
through the underpass, under the intersection, and entering
Grenfell Street through the exit at east Terrace.
I first suggested a tunnel through the parklands in a letter
to the editor some 10/15 years ago.
I have been following the construction with interest.
©billpurvis

A teaser - how many people are there working on the apartment block? Is the fire engine moving too fast relatively?

A Fire Engine crosses Hackney Road at North Terrace intersection.


The Entrance/Exit towards the eastern foothills from Grenfell Street
East Terrace T junction.


Terrainisaurus Digger
(that's why it is in a cage)
in the background Tandanya Aboriginal Cultural Art Gallery



Still photographs.

The Entrance/Exit - how will the landscaping play out?


EPA1
EPA2





What to wear.

I'm on this side

Now I'm on the other side.

Surveillance

Tunnel entrance/exit.

Height limit 4 metres.

Selling the message

A look down Hackney Road - tunnel construction in progress.

Soon to be covered

Tex takes a bus. Adelaide Crows captain advertising AFL App.

The OBahn bus on the road will soon be in the Tunnel.

Roadside detritus



Hackney Road/North Tce intersection


Is that a Riley? I have been advised it is a Citroen Type 7A.

These views are from my previous foray in July 2016.
There has been a significant change.